
Works Description
MARCH 2023 TO DECEMBER 2023
An industrial subdivision development located beside Auckland Airport.
We carried out the bulk earthworks on a measure and value contract, which comprised of 100,000m3 of topsoil stripping, cut to fill, pre load, and cut to waste.
We carried out the cut to fill with our CAT 627G motor scrapers and cut to waste with excavator and articulated dump trucks.