
Works Description
OCTOBER 2021 TO MAY 2022
A 60 hectare industrial subdivision development located in Wiri, Auckland.
We carried out the bulk earthworks on a measure and value contract, which comprised of 650,000m3 of topsoil stripping, cut to fill, cut to stockpile and top soil respread.
We carried out the cut to fill with our CAT 627G motor scrapers and cut to waste with our 50t excavator and 40t articulated dump trucks.