Works Description
OCT 2024 TO FEB 2025
An overburden removal contract of 90,000m3 which involved excavating the pit benches to design, load and hauling the material across Matakana Valley Road to the overburden dump and placing to design. The scope also involved constructing new erosion sediment control ponds.